Equipement

Basic equipments:

1.   Refreshing and/or heating ceiling according to the need included
2.   Individual regulation per unit included
3.   Double technical floor included
4.   Double glass plus a “double skin type” glass on the road side to prevent noise
and heating problems
included
5.   Space quickly adaptable to your wish included
6.   Restroom for disabled at each floor, excepted for Quai de la Poste 4 included
7.   Access for disable at each floor, excepted for Quai de la Poste 4 included
8.   1 floor box every 2 frames on each side of the walkway with 6 universal plugs,
2 electrical plugs 220V and 2 electrical plugs 220V on ceiling detectors
included
9.   1 service plug on the façade every 2 units included
10.   Cable TV available on each floor included
11.   Lighting for the common area and the walkway included
12.   Square carpeting included
13.   Spare chimney for the installation of an emergency unit (gaz) included
14.   3 elevators including 1 duplex included
15.   6 different entrances possible included
16.   Sprinkler in the garage included
17.   Fire detection (excluding the garage) included
18.   Intrusion detection by infrared placed in the common area and walkways included
19.   Video monitoring of the entrances and elevators common access included
20.   Access control included
21.   Lightning protection included
22.   Compensation battery included

 

Optional equipments:

23.   Optical fiber available by Colt or Swisscom on demand
24.   Possibility to open the windows in the new building on demand
25.   UPS for security elements on demand
26.   Removable partition and installation of the commonplaces on demand
27.   Conference rooms with kitchenette, banking safe
(without furniture, video apparatus, etc.)
on demand

 

Estimated completion date for the building is September 2008